Skip to content

👋Sign In or Create an Account

Welcome back! Please sign in to access your account and manage your orders. If you're new to our website, you can easily create an account to enjoy personalized features and faster checkout.

Skip to product information
1 of 6

Jiaruixin Children'S Electric Car Gear Switch, Electronic Forward Gear And Reverse Gear Switch, For Children'S Toy Car Replacement Parts Switch

Jiaruixin Children'S Electric Car Gear Switch, Electronic Forward Gear And Reverse Gear Switch, For Children'S Toy Car Replacement Parts Switch

Hurry! Only left 10 in stock

SKU: WBTOYB08WCLN9S4
UPC: 734086796280
Brand: Jiaruixin
Product Type: Replacement Parts
Regular price $13.96 USD
Sale price $13.96 USD Regular price $19.94 USD
SAVE 29%
Shipping calculated at checkout.

Estimated delivery: 3-5 days(United States), 8-12 days (International).

Return within 15 days after Delivery. Duties & taxes are non-refundable.

  • Amazon
  • American Express
  • Apple Pay
  • Diners Club
  • Discover
  • Google Pay
  • iDEAL
  • Mastercard
  • PayPal
  • Shop Pay
  • Venmo
  • Visa

Guarantee safe and secure checkout

View full details
Description

S9088 2588Children'S Electric Car Electronic Forward Stop Back Switch With High And Low Speed, Simulation Car Gear Handle Switch

Shipping Information

Shipping Information for Toytooth

Packaging & Shipping Protection
All orders are shipped in double boxes and come with full insurance for additional protection. Items are usually shipped within 2-3 working days. We are based right here in the United States, and we use secure shipping methods for your peace of mind. For your protection, we may contact you for extra verification of the payment method.

The product will be delivered to your doorstep, carefully packed to avoid any damage. We understand that privacy is important to our customers, and we aim to provide DISCREET packaging. The product name, description, sender's name, or any details that could hint at the product inside will be encrypted to ensure privacy. The package you receive will be completely discreet.

Note: All orders above $250 will require a signature upon delivery.


Shipping Destinations

We currently ship to the following countries:

United States 
Spain Denmark Slovak Republic Latvia
Great Britain Poland Japan Singapore Finland
Canada Portugal Hungary Lithuania India
Germany UAE Australia Slovenia Estonia
France Austria Croatia Bulgaria Turkey
Netherlands Belgium Czech Republic Luxembourg Israel
Sweden Italy Ireland Saudi Arabia  Switzerland

 


Processing Time

Orders are processed within 1-3 business days.


Shipping Methods & Delivery Times

Delivery times are estimates and may vary depending on the customer's location, customs processing, weather conditions, or other unforeseen circumstances.

  • Domestic orders: Usually take 3-5 business days to deliver.
  • International orders: Usually delivered in 8-12 business days.

Shipping Costs

Shipping costs are calculated at checkout based on the shipping destination and selected shipping method. We offer free standard shipping within the United States.


Customs, Duties, and Taxes

International orders may be subject to customs duties, taxes, and import fees imposed by the destination country. These charges are the responsibility of the customer. Please check with your local customs office for more details.


Order Tracking

Once your order has shipped, you will receive a tracking number via email to monitor your shipment's progress.


Lost or Delayed Shipments

If your package is lost or significantly delayed, please contact our support team, and we will assist you in resolving the issue.


Returns & Refunds

For details on returns and refunds, please refer to our Return Policy page.


For any questions, feel free to contact our customer service team at support@toytooth.com.


Safety & Compliance

⚠️ WARNING (California Proposition 65):
This product may contain chemicals known to the State of California to cause cancer, birth defects, or other reproductive harm.
For more information, please visit www.P65Warnings.ca.gov.

Frequently Asked Questions

  • Q: What types of toy cars is the jiaruixin Electric Car Gear Switch compatible with? A: The jiaruixin Electric Car Gear Switch is designed for specific children's riding toy cars. It is essential to ensure that the purchased switch has the same appearance and dimensions as the original parts to guarantee compatibility.
  • Q: Can the jiaruixin Electric Car Gear Switch be installed by myself? A: While the jiaruixin Electric Car Gear Switch is a replacement part, it is not suitable for DIY modification. It features a 6P 2P connector, so it's crucial to pay attention to the connector socket during installation.
  • Q: What functions does the gear switch provide for the toy car? A: The jiaruixin Electric Car Gear Switch allows for electronic forward and reverse motion, along with high and low-speed settings. It effectively simulates the gear handle of a real car, enhancing the driving experience for children.
  • Q: What materials is the jiaruixin Electric Car Gear Switch made of? A: The jiaruixin Electric Car Gear Switch is made of high-quality plastic, ensuring durability and reliability for children's use in their riding toy cars.
  • Q: How does the jiaruixin Electric Car Gear Switch enhance the safety of children's riding toy cars? A: By providing a reliable gear switch with forward, stop, and reverse functions, the jiaruixin Electric Car Gear Switch helps parents control the speed and direction of the toy car, enhancing the overall safety and control during playtime.
Home Shop
Wishlist
Log in
×